Culvert replacement on Route 642 in Madison County begins May 4 Duet Road will be closed for approximately three weeks, weather permitting, with a posted detour to install concrete pipes CULPEPER — On Monday, May 4, Virginia Department of Transportation (VDOT) crews will close a portion of Route 642 (Duet Road) over Leathers Run in Madison County for approximately three weeks to install reinforced concrete pipes. The project will replace the existing culvert, which consists of three corrugated metal drainage pipes. The existing structure was built in 1990. During construction, drivers will be detoured approximately 8 miles using the following routes:

  • Route 231 (South F.T. Valley Road/North Blue Ridge Turnpike)
  • Route 609 (West Hoover Road)
  • Route 641 (Weaver Hollow Road) During the week of May 4, motorists can expect intermittent lane closures with flaggers directing traffic on South F.T. Valley Road for construction activities. Weather permitting, the culvert replacement project is expected to be complete, and Duet Road reopened to traffic by Friday, May 22. Message boards will be posted in advance of the road closure to notify motorists about the upcoming project and detour. Access to driveway entrances within the closure area will be maintained for residents. According to a recent VDOT traffic count, approximately 119 vehicles use this portion of Duet Road daily. Local updates about conditions in VDOT’s Culpeper District are posted to X.com/VaDOTCulp and the Culpeper District Facebook page. Current traffic conditions, VDOT’s statewide network of traffic cameras, and other travel information are available on the 511Virginia website, the free VDOT 511 mobile app, or by calling 511 from any phone in Virginia. Media contact Last updated: November 17, 2026