city hall watchOfficial Guide
修复和维护街道更新8月17日 21日
🌐 Original languageThe full text below is in the original language. Tap to translate it into your language.
亚历山大铺设17-21日
Curated byThe Neighbor Times
Last checkedAug 17, 2026
Information is for general purposes only — verify details with the official agency before taking action.
Read the original ↗🚨 Alert — what to do now
亚历山大市交通与环境服务局公布了8月17日至21日的街道重铺与混凝土维护时间表。
Summary translated to 15 languages · no full mirror
📍国王街施工区 — Concrete and storm drain work at the intersection with Dawes Avenue
Directions → 📍国王街200号街区施工区 — Concrete work between South Fairfax Street and South Lee Street
Directions → 📍伍德兰台工作区 — Concrete work from Russell Road to Braddock Road
Directions → 📍莱尔德广场作业区 — Concrete work from Tennessee Avenue to Manor Road
Directions → 📞 703.746.4042📞 703.746.3960Source quotes (6)
国王街施工区 — “King Street (concrete and storm drain work at the intersection with Dawes Avenue)”
国王街200号街区施工区 — “200 block of King Street (concrete work between South Fairfax Street”
伍德兰台工作区 — “Woodland Terrace (concrete work from Russell Road to Braddock Road)”
莱尔德广场作业区 — “Laird Place (concrete work from Tennessee Avenue to Manor Road)”
铺路作业相关问题 — “contact Asi Mbah at 703.746.4042”
语言通达服务 — “email LanguageAccess@alexandriava.gov or call 703.746.3960”
All facts verified against official source quotes · general info, verify with the official agency
🌐This translation was AI-generated. For interpretation, the original (English) is authoritative.
Local impact analysis
Set your area to see how this story may affect your community.
翻译中有不自然的表达或错误吗?
Community Trust Check0 readers rated Rate this article's accuracy and balance. 5 more needed before this affects ranking
Sign in to rate this article.Login → Are the facts accurate?
Is there a bias?
🤝 Community NotesOLDEST FIRST, FIXED— auto-translated to your language
Loading...
🔍 Related Sources & Further Reading
🔍Finding related sources...