Repaving and street maintenance update august 17 21
Pagpapad sa Alexandria Aug 17-21
🚨 Alert — what to do now
Inihayag ng Kagawaran ng Transportasyon at Serbisyong Pangkapaligiran ng Lungsod ng Alexandria ang iskedyul ng muling pag-aaspalto ng mga kalsada at pagpapanatili ng kongkreto para sa Agosto 17 hanggang 21.
Summary translated to 15 languages · no full mirror
Lugar ng Paggawa sa King Street — Concrete and storm drain work at the intersection with Dawes Avenue
Lugar ng Paggawa sa 200 Block ng King Street — Concrete work between South Fairfax Street and South Lee Street
Lugar ng Paggawa sa Woodland Terrace — Concrete work from Russell Road to Braddock Road
Source quotes (6)
Lugar ng Paggawa sa King Street — “King Street (concrete and storm drain work at the intersection with Dawes Avenue)”
Lugar ng Paggawa sa 200 Block ng King Street — “200 block of King Street (concrete work between South Fairfax Street”
Lugar ng Paggawa sa Woodland Terrace — “Woodland Terrace (concrete work from Russell Road to Braddock Road)”
Lugar ng Paggawa sa Laird Place — “Laird Place (concrete work from Tennessee Avenue to Manor Road)”
Mga Tanong Tungkol sa Operasyon ng Pag-aaspalto — “contact Asi Mbah at 703.746.4042”
Mga Serbisyo sa Pag-access sa Wika — “email LanguageAccess@alexandriava.gov or call 703.746.3960”
All facts verified against official source quotes · general info, verify with the official agency
Rate this article's accuracy and balance. 5 more needed before this affects ranking
🤝 Community NotesOLDEST FIRST, FIXED— auto-translated to your language
Loading...
Add Local Context
🔍 Related Sources & Further Reading
Finding related sources...