Repaving and street maintenance update august 17 21
Alexandria Paving Aug 17-21
🚨 Alert — what to do now
The City of Alexandria Department of Transportation and Environmental Services announced the street repaving and concrete maintenance schedule for August 17 to 21.
Summary translated to 15 languages · no full mirror
King Street Work Area — Concrete and storm drain work at the intersection with Dawes Avenue
200 Block King Street Work Area — Concrete work between South Fairfax Street and South Lee Street
Source quotes (6)
King Street Work Area — “King Street (concrete and storm drain work at the intersection with Dawes Avenue)”
200 Block King Street Work Area — “200 block of King Street (concrete work between South Fairfax Street”
Woodland Terrace Work Area — “Woodland Terrace (concrete work from Russell Road to Braddock Road)”
Laird Place Work Area — “Laird Place (concrete work from Tennessee Avenue to Manor Road)”
Paving Operations Questions — “contact Asi Mbah at 703.746.4042”
Language Access Services — “email LanguageAccess@alexandriava.gov or call 703.746.3960”
All facts verified against official source quotes · general info, verify with the official agency
Rate this article's accuracy and balance. 5 more needed before this affects ranking
🤝 Community NotesOLDEST FIRST, FIXED— auto-translated to your language
Loading...
Add Local Context
🔍 Related Sources & Further Reading
Finding related sources...